Skip to main content

Monitoring Project goes online

January 25, 2012

Staff photo - The Elk County Monitoring Project website is now up and running and available to the public.

The Elk County Monitoring Project website is now up and running and available to the public.
The website, powered by NexSens Technology, relays data from the satellite telemetry systems installed in the streams and watersheds.
The monitoring project is designed to keep an eye on stream conditions in the wake of the Marcellus Shale drilling by measuring the temperature, flow and conductivity in each stream. The total project cost for the program is estimated at $329,330.
Two of the 11 systems are online and running.

Headed into the final bout of the night, the St. Marys Area Flying Dutchmen held a slim three-point...
The Elk County Catholic Crusaders defeated the Sheffield Wolverines by a 71-33 score on Little...
The St. Marys Area gymnastics squad hosted the St. Marys Area Gymnastics Invitational on Saturday...
On March 14, 2012, Governor Tom Corbett signed into law a contentious piece of legislation...